Allied Telesis x530L Series Installation Manual page 124

Stackable gigabit layer 3+ ethernet switches
Hide thumbs Also See for x530L Series:
Table of Contents

Advertisement

Chapter 5: Installing the Switch in an Equipment Rack
124
3. Have another person hold the switch at the desired location in the
equipment rack while you secure it using four standard equipment rack
screws (not provided). Refer to Figure 67.
Figure 67. Installing the Switch in an Equipment Rack
4. After installing all the switches of the stack:
To build the stack with the default stacking ports, refer to Chapter
7, "Building the Trunk with the Default 10Gbps Stacking Ports" on
page 141.
To build a stack of x530L-10GHXm or x530L-18GHXm switches
using 5Gbps ports for the trunk, refer to Chapter 8, "Building the
Stack Trunk with 5Gbps Multi-Speed Ports" on page 161.
49
S FP
51
FA
U LT
50
C O
PO
1G
N SO
W ER
/1 00
LE
52
U SB
ON
ER
R
AC
T
LA
CL
SE
R PR
AS
S 1
OD
UC
T

Advertisement

Table of Contents
loading

Table of Contents