8. If there is a third switch, power it on and wait another two minutes for it
to join the stack as a member with the ID number 3.
9. If there are additional switches, continue to power each one at a time
and wait two minutes for it to join the stack as a member with the next
ID number.
At this point, the stack is operational.
The ID numbers are automatically stored in special files in the flash
memories of the switches and are retained by the devices even if you
reset or power cycle the stack.
To continue with the installation, go to "Starting a Local Management
Session" on page 150 and "Verifying the Stack" on page 153.