MRU GmbH
For outdoor installation
Ensure that the analyzer is mounted on a rain and sun protected place (weather shade).
For indoor installation:
Ensure that the analyzer is installed on a dry and clean place. Be sure that the room is
permanently vented with fresh air (forced ventilation).
Connect the VENT gas-outlet of the device to ambient by using adequate tube with min
Ø8mm ID.
The device must be mounted in a room, which is ventilated enough. The vent must tube
above into an area, where is no ignition source.
In a radius of min. 30 cm the vented gas can have the potential to be explosive.
Explosion hazard
Be sure, that around the vent is no ignition source.
Every sample point must be equipped with a safety valve, which allows the operator to
close the sample point from the analyser quickly.
Safety valve
The operator must install a safety valve on every single sample
point. The valve must be resistance against the sample gas.
Max. x6 gas inlets
SWG 100 BIO Ex User Manual
DANGER
DANGER
Page 41
of
150
Need help?
Do you have a question about the SWG100 BIO-EX and is the answer not in the manual?