Shimming The Secondary Shaft - MASSEY FERGUSON 5400 Service Manual

Hide thumbs Also See for 5400:
Table of Contents

Advertisement

GBA20 mechanical reverse shuttle
E . Shimming the secondary shaft
37. Secure the unit in a clamp fitted with soft jaws.
Preparing for shimming
38. Manually check for clearance on the secondary
shaft (19) in the housing (26).
If there is no clearance, momentarily remove one
or several shims (1).
Shimming
39. Position the dial gauge feeler pin on the end of the
shaft (19)
(Fig.
14).
40. Pull hard on the secondary shaft (19) to correctly
position the ball bearing (24) against the circlip (25).
41. Set the dial gauge to zero.
42. Repeat operation
40
bearing (9) up against the shoulder of the housing
(26).
43. Depending on the clearance measured, select a
new thickness of shim(s) (1) to obtain a clearance
of J1 = 0.05 to 0.20 mm
N
: If possible, shim the secondary shaft close
OTE
to the minimum tolerance value.
44. Take off circlip (25).
45. Position the final shim(s) (1) selected during opera-
tion
43
on the bearing (24).
46. Refit the circlip (25). Check that it is positioned
correctly at the bottom of the groove.
05C01.14
while pushing to bring the ball
(Fig.
15).
19
MA-05-05046A
J1 = 0,05 / 0,20 mm
MA-05-05047A
Massey Ferguson 5400 - Issue 1.a
Fig. 14
Fig. 15

Advertisement

Chapters

Table of Contents
loading

Table of Contents