Overview; Kit Contents; Related Documentation From Texas Instruments; Table 1-1. Contents Of Dac53701Evm Kit - Texas Instruments DAC53701EVM User Manual

Hide thumbs Also See for DAC53701EVM:
Table of Contents

Advertisement

Overview

1 Overview
The DAC53701EVM is an easy-to-use platform to evaluate the functionality and performance of the DAC53701
and DAC43701 commercial devices. This EVM is also designed to evaluate the automotive-version devices,
DAC53701-Q1 and DAC43701-Q1.
The 10-bit DAC53701 and 8-bit DAC43701 (DACx3701) are a pin-compatible family of buffered voltage-output
digital-to-analog converters (DACs). These devices have nonvolatile memory (NVM), an internal reference, and
2
a PMBus
compatible I
supply as a reference, and provide full-scale output of 1.8 V to 5.5 V. The devices communicate through the I
interface. These devices support I
Mbps). The DACx3701 are feature rich, and include features such as PMBus voltage margin commands (for
example, turn on/off, margin high or low, and more), digital slew rate control, user-programmable power up to
high impedance, a standalone waveform generator (square, ramp, and sawtooth), a medical alarm tone
generator (low, medium, and high priority), and a dedicated feedback pin. The EVM provides the GPIO and I
programming interface using a PC-based graphical user interface (GUI).

1.1 Kit Contents

Table 1-1
details the contents of the EVM kit. Contact the TI Product Information Center nearest you if any
component is missing. TI highly recommends that the user verify latest versions of the related software at the TI
website, www.ti.com.
DAC53701EVM evaluation board PCB
BOOSTXL-DAC-PORT
MSP-EXP432E401Y Launchpad (TI Launchpad)
TI Launchpad can be purchased from

1.2 Related Documentation from Texas Instruments

The following document provides information regarding Texas Instruments integrated circuits used in the
assembly of the DAC53701EVM. This user's guide is available from the TI web site under literature number
SLAU841. Any letter appended to the literature number corresponds to the document revision that is current at
the time of the writing of this document. Newer revisions may be available from the TI web site at http://
www.ti.com/, or call the Texas Instruments Literature Response Center at (800) 477-8924 or the Product
Information Center at (972) 644-5580. When ordering, identify the document by both title and literature number.
4
DAC53701EVM
C interface. The DACx3701 operate with either an internal reference or the power
2
C standard mode (100 kbps), fast mode (400 kbps), and fast mode plus (1

Table 1-1. Contents of DAC53701EVM Kit

Item

Table 1-2. Required Components Not Included With Kit

Item
the MSP432E401Y tool folder

Table 1-3. Related Documentation

Document
DAC53701
product data sheet
DAC43701
product data sheet
DAC53701-Q1
product data sheet
DAC43701-Q1
product data sheet
Copyright © 2020 Texas Instruments Incorporated
Quantity
1
Quantity
1
1
on www.ti.com.
Literature Number
SLASEY5
SLASEW8
SLAU841 – OCTOBER 2020
Submit Document Feedback
www.ti.com
2
C
2
C

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the DAC53701EVM and is the answer not in the manual?

Table of Contents