www.ti.com
2 System Setup
2.1 Software Setup
This section provides the procedure for EVM software installation.
2.1.1 Operating Systems
The EVM software is compatible with the Windows
2.1.2 Software Installation
The software is available on the device product folder, and can also be found in the
Search for DAC53701EVM in the GUI Composer Gallery. Use the down arrow symbol to download the software.
There are two downloads: DAC53701EVM GUI and GUI Composer Runtime. Either download both, or just
download the EVM GUI; the runtime file can be downloaded through the EVM GUI during installation. The
software can also be run online by clicking; however, only after the firmware and driver are upgraded. After the
software is downloaded onto the PC, navigate to the download folder, and run the DAC53701EVM software
executable, as shown in
When the DAC53701EVM software is launched, an installation dialog window opens and prompts the user to
select an installation directory. If left unchanged, the software location defaults to C:\Program Files (x86)\Texas
Instruments\DAC53701 EVM as shown in
Runtime application, the installer also requests for an automatic download from the web. Select either Install
from Web to download and install from the web, or Install from PC and provide the path to the local file that is
already downloaded. The runtime file also installs the USB drivers, unless the drivers are already installed. The
software installation automatically copies the required files and drivers to the local machine.
SLAU841 – OCTOBER 2020
Submit Document Feedback
Figure
2-1.
Figure 2-1. DAC53701EVM Software Setup
Figure
2-2. If there is no previous installation of the GUI Composer
Figure 2-2. Software Installation Path
Copyright © 2020 Texas Instruments Incorporated
™
7, 8, and 10 operating systems.
System Setup
GUI Composer
Gallery.
DAC53701EVM
5
Need help?
Do you have a question about the DAC53701EVM and is the answer not in the manual?