The connection diagram and steps of local measurement are as follows:
1. Confirm that the power switch is in the OFF position and verify that there is
2. Remove the output terminals cover of the power system.
3. Loosen the screws of the output terminals and connect the red and black
4. Thread the red and black test cables through the output terminals cover of
5. (Optional) According to the actual situation of DUT, connect the grounding
6. Connect the other end of the red and black cables to the DUT. The positive
Connecting the DUT (Remote Sensing)
Remote measurement is available for the following scenarios:
When the DUT consumes large current or the wires are too long, there is a volt-
age drop on the wires between DUT and output terminals of the power system.
To maximize measurement accuracy, the power system provides the remote
measurement terminals VS+ and VS- on the rear panel, which can be used to
measure the terminal voltage of the DUT.
For Regenerative Power System, the input terminals in Load mode are the
same terminals as the output terminals in Source mode. Therefore, this man-
ual uses Source mode as an example to describe how to connect to the
DUT.
no dangerous voltage on the connection terminals.
test cables to the output terminals. Re-tighten the screws.
When maximum current that one test cable can withstand fails to meet the
rated current, use multiple pieces of red and black test cables. For example,
the maximum current is 1,200A, then 4 pieces of 360A red and black cables
are required.
the power system and install the cover.
terminal on the rear panel of the instrument to the DUT to ensure the safe
grounding.
For the location information, see
and negative poles must be properly connected and fastened when wiring.
Copyright © Itech Electronic Co., Ltd.
Inspection and Installation
1.5 Rear Panel
Introduction.
31
Need help?
Do you have a question about the IT-M3900B Series and is the answer not in the manual?