ITech IT-M3900B Series User Manual page 145

Regenerative power system
Table of Contents

Advertisement

When VON LATCH function is started, the load starts load test only when
the power voltage rises and is higher than Von Point loading voltage. When
the power voltage drops and is lower than Von Point unloading voltage, the
load will unload.
The procedures to set Von function are as follows.
Copyright © Itech Electronic Co., Ltd.
Load Function
133

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the IT-M3900B Series and is the answer not in the manual?

Subscribe to Our Youtube Channel

Table of Contents