Manitowoc Grove RT765E-2 Operator's Manual page 137

Hide thumbs Also See for Grove RT765E-2:
Table of Contents

Advertisement

RT765E-2 OPERATOR MANUAL
7
5
Item
1
Valve Control Levers
2
Removal Cylinders
3
Cylinder Attach Pins
4
Counterweight Attach Pins
5
6740 kg (14,860 lb) Counterweight
6
Leveling Bolts (4 places)
7
Counterweight Lifting Lugs (4 places)
9.
Adjust
the
four
counterweight
(Figure 4-24) to eliminate any relative movement
between the counterweight and the turntable.
Grove
2
6 (4 places)
4
Description
leveling
Published 4-09-2021, Control # 364-11
6670
4
The crane is now ready for operation with the counterweight
installed.
bolts
SET-UP AND INSTALLATION
1
2
3
FIGURE 4-23
Leveling Bolts
FIGURE 4-24
4
4-27

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Grove RT765E-2 and is the answer not in the manual?

Subscribe to Our Youtube Channel

Table of Contents