GRT655/655L OPERATOR MANUAL
6.
Reinstall the pin and retaining clip (Figure 5-43).
9216-4
Grove
7.
Connect
anti-two-block cable end connector to the anti-two-block
switch at the nose of the boom extension stinger section.
FIGURE 5-43
Published 3-23-2020, Control # 654-04
SET-UP AND INSTALLATION
the
boom
extension
stinger
section
5
5-35
Need help?
Do you have a question about the Grove GRT655 and is the answer not in the manual?