Fike SHP 10-051 Product Manual page 41

Conventional fire alarm/suppression system
Table of Contents

Advertisement

FIKE CORPORATION
6.3.2 EVENT DESCRIPTION / POSSIBLE RESOLUTION
Diagnostic Display Code
1
2
3
4
1.
2.
3.
4.
5
6
7
NOTE: The # 6 is often
confused with letter "b".
8
9
5.
6.
7.
8.
9.
UL S2203
FM 0Z8A0.AY
Description
Input Circuit 1 open
Input Circuit 2 open
Input Circuit 3 open
Input Circuit 4 open
Input Circuit 1 activated
Input Circuit 2 activated
Input Circuit 3 activated
Input Circuit 4 activated
Audible Circuit 1 open
Audible Circuit 2 open
Audible Circuit 3 open
Agent Release Circuit open
Solenoid Circuit open
Audible Circuit 1 shorted
Audible Circuit 2 shorted
Audible Circuit 3 shorted
Agent Release Circuit shorted
(or initiator open)
Solenoid Circuit shorted
SHP Product Manual
Manual P/N: 06-130
firealarmresources.com
Tips to Resolve
Verify correct value EOL Resistor (4.3 K -
Yellow-Orange-Red) has been installed.
Measure field wiring resistance = 20 Ω or less.
Verify all field devices are installed properly
(smoke detector heads installed on bases).
Remove field wiring and install a 4.3K resistor at
panel to verify SHP Control Board is functioning
properly.
Verify correct value EOL Resistor (4.3K -
Yellow-Orange-Red) has been installed.
Measure field wiring resistance = 100Ω or less.
Verify all field devices are installed properly.
Remove field wiring and install a 4.3K resistor at
panel to verify SHP Control Board is functioning
properly.
If device was not the cause of the activation
check field wiring for shorts, or a faulty device.
Reference Section 6.3.1, Typical Voltages and
Tolerances to determine if circuit is activated or
shorted.
Verify correct value EOL Resistor (4.3 K -
Yellow-Orange-Red)
Verify correct value EOL Resistor (2 K Red-
Black-Red) has been installed.
Measure field wiring resistance = reference
Section 4.2
Verify all field devices are installed properly.
Remove field wiring and install a 2K resistor at
panel to verify SHP Control Board is functioning
properly.
Verify correct value EOL Resistor (2.7 K Red-
Violet-Red) has been installed.
Measure field wiring resistance = reference
Section 4.2
Verify all field devices are installed properly.
Agent Disconnect Switch in disconnected mode.
Remove field wiring and install a 2.7K resistor at
panel to verify SHP Control Board is functioning
properly.
Measure field wiring resistance = reference
Section 4.2
Verify all field devices are installed properly.
Remove field wiring and install a 200 Ω 5 watt
(P/N 02-2686) resistor at the panel to simulate a
solenoid. This will verify SHP Control Board is
functioning properly.
Check field wiring for short circuit or a faulty
device.
If panel has released agent replace GCA.
Verify EOL Resistor value is correct.
SERVICING
Page 35 of 43
Rev. No: 3, 04/02