Mitsubishi Electric AJ65BT-D62 User Manual page 78

High-speed counter module
Hide thumbs Also See for AJ65BT-D62:
Table of Contents

Advertisement

9. SELECTING AND EXECUTING THE COUNTER FUNCTION
Downloaded from
ManualsNet.com
1) ...... The counter's present value 0 is stored into the periodic pulse count present
value storage area {addresses RWrn+4 to 5 (RWrn+C to D)} (hereinafter
called the present value storage area).
2) ...... The counter's present value 200 is stored into the present value storage area.
The count value 0 stored until then is stored into the periodic pulse count
previous value storage area {addresses RWrn+2 to 3 (RWrn+A to B)}
(hereinafter called the previous value storage area).
3) ...... The counter's present value 20 is stored into the present value storage area.
The count value 200 stored until then is stored into the previous value storage
area.
4) ...... The counter's present value 100 is stored into the present value storage area.
The count value 20 stored until then is stored into the previous value storage
area.
5) ...... The counter's present value 50 is stored into the present value remote register.
The count value 100 stored until then is stored into the previous value storage
area.
6) ...... The periodic pulse counter function is executed independently of whether the
count enable command {RY(n+1)4 (RY(n+1)B)} is on or off.
7) ...... While the periodic pulse counter function is being executed, the following value
is stored into the sampling/periodic counter flag storage area.
Operating Status
Remote register
address (RWrn+6)
search engine
During Execution
During Execution
at CH1 Only
at CH2 Only
K1
9 - 11
MELSEC-A
During Execution
at CH1 and CH2
K2
K3

Advertisement

Table of Contents
loading

This manual is also suitable for:

Aj65bt-d62dAj65bt-d62d-s1

Table of Contents