Figure 111. Expansion tray air baffle installation
Attention: Air baffle is required for airflow that creates proper cooling. Make sure proper air baffles
for system configuration is installed before the power is turned on.
Step 2.
Slightly slide power supply 2 out from the power supply bay (see
supply unit" on page
Step 3.
Grip on the blue touch point on the handle of the expansion tray, and lift it up; then, lower the tray
vertically into the server with nailheads aligned to the slots on both sides.
Step 4.
Rotate the handle all the way down. This connects and fix the expansion tray to the system board.
ThinkSystem SR850P Maintenance Manual
114
94).
"Remove a hot-swap power