Introduction
1 Introduction
The
ADC3541EVM
is an evaluation board used to evaluate the ADC3541 analog-to-digital converter (ADC) from
Texas Instruments. The
ADC3541EVM
per second (MSPS). The output data is transmitted over 1.8-V CMOS logic.
•
Transformer and FDA coupled analog inputs
•
Transformer coupled or singled ended clock inputs
•
INA226 current shunt monitors for evaluating power consumption
•
FMC connector to easily interface with popular FPGA evaluation boards
•
Device register programming through USB connector and FTDI USB-to-SPI translator
The TSW1400EVM captures the CMOS output data, and uploads to a connected PV through a USB interface for
analysis. The High-Speed Data Converter Pro
and processes the data.
2 Equipment
This section describes how to setup the EVM on the bench with the proper equipment to evaluate the full
performance of the ADC device.
2.1 Evaluation Board Feature Identification Summary
Ensure that jumper J8 is shunted in the 2-3 position. This allows 5 V to be supplied to the
the mini-USB connector.
2
ADC3541EVM Evaluation Module
is a single-channel, 14-bit ADC that can operate up to 10 Mega-samples
(HSDC
Pro) software on the PC communicates with the hardware
Figure 2-1. ADC3541EVM Feature Identification
Copyright © 2020 Texas Instruments Incorporated
www.ti.com
ADC3541EVM
through
SBAU294 – JULY 2020
Submit Document Feedback
Need help?
Do you have a question about the ADC3541EVM and is the answer not in the manual?