Download Print this page

olympia electronics GR-427/12L/MAR Quick Start Manual

Self testing maintained emergency luminaire

Advertisement

Quick Links

GR-427/12L/MAR
OPERATION VOLTAGE
MAXIMUM POWER CONSUMPTION
BATTERY (Ni-Cd)
BATTERY PROTECTION
INDICATIONS - CONTROLS
CHARGING TIME
MINIMUM AUTONOMOUS DURATION
ILLUMINATION SOURCE
ILLUMINATION (230V / EMERGENCY)
DEGREES OF COVER PROTECTION
PRODUCED IN ACCORDANCE WITH
OPERATION TEMPERATURE RANGE
RELATIVE HUMIDITY
CONSTRUCTION MATERIALS
EXTERNAL DIMENSIONS
TYPICAL WEIGHT
GUARANTEE
Thank you for purchasing this product of
O l y m p i a E l e c t r o n i c s . A E u r o p e a n
manufacturer.
GENERAL
These luminaires are suitable for marine and
offshore applications where emergency light
i s n e e d e d . E a c h l u m i n a i r e m u s t b e
permanently connected to mains power
supply. In normal operation the led strip lights
and the battery is charging. In case of a
mains power supply failure the luminaire will
light the led strip automatically in emergency
mode. When the mains power supply is
restored the device turns to normal operation.
INSTALLATION
To install the luminaire follow the installation
instructions on page 4.
Battery Charging
The battery charging is completely controled.
In this case, is achieved the perfect battery
maintenance , as well as the elongation of its
duration. When the battery has completely
charged, it charges with a maintenance
current.
Battery Cut-off
The luminaire enters in this operation when
the mains power supply fails and battery has
lost its energy. During this operation the
luminaire enters the idle state and battery
Page 1 from 4
High Quality European based Manufacturers
SELF TESTING MAINTAINED EMERGENCY LUMINAIRE
TECHNICAL CHARACTERISTICS
Charge, lamp fault, fault indication LED, TEST button
EN 60598-1, EN 60598-2-22, ΕΝ 55015, ΕΝ 61547, ΕΝ 61000-3-2, ΕΝ 61000-3-3, IEC 60092-306, IEC 60533
220-240V AC/50-60Hz
3.5W / 7VA
3.6V/3Ah
From overcharge and full discharge
24h
480 min
12 white LED's
85/85lm
IP 42
5 to 40 C
Up to 95%
Bayblend FR3010, transparent polycarbonate
272 x 121 x 50 mm
600gr.
3 years (1 year for the battery)
consumption is negligible, in order to be
protected from deep discharge.
Manual Test
The manual test can be conducted only if the
main power supply and the battery is
connected. By pressing the test button briefly
an operation test is initiated. During this test
period all indication LEDs are OFF.
Automatic Test
This test includes all the operations that
provide the manual test and is conducted
automatically every 15 days. In order to be
performed, the main power supply and the
battery should be connected.
Automatic Autonomous Test
The Automatic Autonomous Test is conducted
and measures the luminaire`s back up
operation. This test is conducted automatically
every six months. In order to be performed,
the main power supply and the battery should
be connected (the battery should be charged).
If the battery is not charged, the test is
postponed until the battery is completely
charged. If during the Automatic Autonomous
Test the luminaire's duration is lower than the
nominal, then the battery must be replaced.
Back Up Operation
The autonomous duration of battery during
emergency mode is at least the one that is
o
923427002_09_002

Advertisement

loading

Summary of Contents for olympia electronics GR-427/12L/MAR

  • Page 1 High Quality European based Manufacturers GR-427/12L/MAR SELF TESTING MAINTAINED EMERGENCY LUMINAIRE TECHNICAL CHARACTERISTICS OPERATION VOLTAGE 220-240V AC/50-60Hz MAXIMUM POWER CONSUMPTION 3.5W / 7VA BATTERY (Ni-Cd) 3.6V/3Ah From overcharge and full discharge BATTERY PROTECTION Charge, lamp fault, fault indication LED, TEST button...
  • Page 2 stated in the list of the first page. During emergency mode, a LED strip test is also ΑΤΤΕΝΤΙΟΝ!!! 1. Operations for installation, maintainance or performed. testing must be done by authorized personel only. Resetting Errors Push the Test button for 5 seconds, to 2.
  • Page 3 MARKING PANEL SP-115 Placing the SP-115 marking panel A marking panel SP-115 can be installed on Place the plastic mounting accessories of the the luminaire in 3 different locations. This marking panel as shown in pictures. marking panel is installed perpendicular to the diffusor of the luminaire, as shown in the pictures below.
  • Page 4 INSTALLATION INSTRUCTIONS Reflector Base plastic Diffusor Cable entry channels Luminaire mounting holes Base plastic 1 To install the luminaire you must dismantle it into 3 parts. 2 Place a flat blade screwdriver in the area Α to release the diffusor’s plastic hook.