11. If installed, remove the energy pack.
12. Remove the PIB assembly.
13. Disconnect the RCM sideband cable from the PDB.
14. Remove the PDB assembly.
15. Remove the power backplane bracket screws (callout 1), and then remove the bracket (callout 2).
16. Detach the power backplane from the PDB.
58
Removal and replacement procedures
Need help?
Do you have a question about the HPE Apollo 2000 Gen10 Plus and is the answer not in the manual?