Test Equipment Depot CW240 User Manual page 48

Clamp-on power meter
Table of Contents

Advertisement

2
Wiring
After the above settings have been completed, carry out wiring, referring to
Chapter 4 in this manual.
3
Voltage Quality Measurement
TOP
MENU
ENTER
1
F
ENTER
ENTER
START
&STOP
For more details, refer to the CW240 User's Manual
Chapter 6, "Configuring Settings"
Subsection 6.7, "Voltage Quality Settings"
Chapter 7, "Making Measurements"
Section 7.8, "Measuring Voltage Quality
(Voltage Dip, Voltage Swell, or Instantaneous Interruption)"
5-24
Test Equipment Depot - 800.517.8431 - 99 Washington Street Melrose, MA 02176
FAX 781.665.0780 - TestEquipmentDepot.com
Displays the Measure screen.
Press the F1 key (DISPLAY CHANGE) for window callup.
Using the cursor key, select VOLT. QUALITY (highlighted).
The Volt. Quality screen appears.
Press the START&STOP key. Start integration
according to the setting of the integration starting method.
"STANDBY" appears until it becomes integration start time.
IM CW240P-E

Advertisement

Table of Contents
loading

Table of Contents