Measuring Electric Energy (Integration Measurement) - Test Equipment Depot CW240 User Manual

Clamp-on power meter
Table of Contents

Advertisement

5.2

Measuring Electric Energy (Integration Measurement)

1
Making Settings
Example:
Measuring electric energy of three-phase three-wire two-current (3P3W2I)
200-V line (50 Hz, 120-A load) using the clamp-on probe 96030 (rating: 200 A)
General 2/2
Setting Item
Wh DISPLAY
Save 1/2
Setting Item
MEASURE START
MEASURE STOP
INTERVAL TIME
DATA SAVE
FILE NAME
Save 2/2
Setting Item
INTEGRATE/DEMAND ON
TOP
MENU
ENTER
General 1/2
General 2/2
Save 1/2
Save 2/2
IM CW240P-E
Description (Setting value)
STANDARD
Description (Setting value)
TIME
2004/07/01 07:00
TIME
2004/07/03 07:00
5 min
PC card
PLANT5
Description (Setting value)
Displays SETUP.
Using the right and left direction cursor key, display
the General screen.
Set up necessary items on the screen.
For details, refer to Chapter 3 in this manual.
Using the right and left direction cursor key, select Data Save screen.
Set up necessary items on the screen.
5-5

Advertisement

Table of Contents
loading

Table of Contents