P_S - Water Pump Of The Solar Circuit; Evu-Sg Digital Inputs For Photovoltaic Input And Smart Grid From Mains Electricity; Additional Temperature Probes - Ferroli OMNIA S HYBRID H 3.2 Installation, Use & Maintenance Manual

Indoor wall unit for split reversible hybrid heat pumps which can be combined with an outdoor dhw heater
Table of Contents

Advertisement

OMNIA S HYBRID H 3.2

P_s - Water pump of the solar circuit

21
CN11
Power supply
A1
A2
Pumpsolar
EVU-SG Digital inputs for photovoltaic input and smart grid from mains
electricity
If the digital inputs for photovoltaic input and smart grid from mains electricity are
enabled by parameter 15.2 (see "9.3.2 Heat pump service menu" on page 60)
and are active. They take priority over the user interface settings.
Digital inputs not enabled (default)
Set par. 15.2 = 0
Digital inputs enabled
Set par. 15.2 = 1
EVU
SG
(photovoltaic input)
(smart grid input)
Closed
Open
Closed
Closed
Open
Closed
Open
Open
Photovoltaic operation
The DHW heater setpoint is set to 70°C to accumulate the electrical energy pro-
duced by the photovoltaic panels.
To meet this DHW request tat 70°C, the heat pump and DHW (TBH) electrical
water heater are used while the boiler stays switched off.
If the heat pump is working for the system, continue to do so and only the DHW
electric boiler heater (TBH) is used.to meet the DHW request. If the heat pump is
not working for the system, it is activated together with the electric DHW heater
(TBH) to meet the DHW request.
Normal operation
In this case, the system works normally according to the set parameters
Smart grid operation
This operation is usually dependent of a smart grid request by the mains electricity
which basically informs the system that the deliverable electric power is decreas-
ing (for example, in the case of electricity production systems through wind or
photovoltaic farms).
The heat pump can support the system in cooling or heating mode for a specific
time (which can be set via a parameter), then it will be deactivated. Once this set
heating time has expired, only the boiler is activated. The heating of the DHW
water heater is, on the other hand, guaranteed by the activation of the boiler alone.
NOTE
If you only want to use photovoltaic input, jumper SG
If you only want to use smart grid input, jumper EVU
25 26
27 28
11
1 2 3 4 5
29 30 31 32
6 7 8 9 10
CN7
CN30
fig. 41 -
Operating status
Photovoltaic operation
Photovoltaic operation
Normal operation
Smart grid operation
Cod. 3542B230 - Rev. 00 - 02/2022
CN5
CN28
CN21
CN29
CN25
CN42
CN40
DIS1
CN41
S3
CN22
CN1
CN2
1
2
3
4
5
6
7
8
9
13
14
15
16
17
18
19
20
CN11

Additional temperature probes

To control the additional system temperature probes, additional temperature
probes may be necessary (available as an accessory).
The probes are connected to the heat pump hydronic board (see "7.9.4 Heat pump
hydronic board" on page 44).
Refer to the instructions supplied with the accessory for the installation.
For the setting parameters, see "9.3.2 Heat pump service menu" on page 60.
Tbt1 probe (system water tank temperature probe)
Set par.15.4=1
Tw2 probe (mixed water temperature probe sent to zone 2)
Set par.15.3=1
Tsolar probe (thermal solar panel temperature probe)
Set par.15.7=1
CN24
CN8
CN6
CN16
CN13
CN15
CN18
S1
S2
CN31
S4
CN4
CN35
CN36
CN17
1
0
1
1
1
2
25
26
27
28
5
21
2
2
2
3
2
4
2
9
3
0
31
32
10
6
7
8
9
CN7
CN30
fig. 42 -
EN
47

Advertisement

Table of Contents
loading

Table of Contents