11
|
Commissioning
Installer reference guide
96
2 Go to [A.2]: Commissioning > Actuator test run.
3 Select Booster heater.
4 Select OK to confirm.
Result: The actuator test run starts. It stops automatically when
ready (±30 min).
To stop the test run manually:
1 In the menu, go to Stop test run.
2 Select OK to confirm.
Possible actuator test runs
▪
Booster heater test
—
EKHWET90~120BAV3
R32 Split series – Domestic hot water tank
4P680077-1 – 2021.11