Daikin website (publicly accessible). To charge additional refrigerant ..........10 To fix the fluorinated greenhouse gases label......10 ▪ The full set of latest technical data is available on the Daikin Business Portal (authentication required). 7 Electrical installation Specifications of standard wiring components ......11 To connect the electrical wiring to the outdoor unit ....
Page 4
(on top of the legislation. instructions described in the Daikin documentation). WARNING CAUTION ▪ If the power supply has a missing or wrong N-phase, ▪ Check if the installation location can support the unit's equipment might break down.
3 About the box WARNING WARNING If appliances contain R32 refrigerant, then the floor area of ▪ ONLY use copper wires. the room in which the appliances are installed, operated ▪ Make sure the field wiring complies with the applicable and stored must be larger than the minimum floor area.
4 Unit installation It is recommended to install a baffle plate when the air outlet is exposed to wind. It is recommended to install the outdoor unit with the air inlet facing the wall and NOT directly exposed to the wind. Baffle plate Prevailing wind direction Air outlet...
4 Unit installation 4.3.3 To provide drainage DANGER: RISK OF BURNING/SCALDING NOTICE If the unit is installed in a cold climate, take adequate 1× measures so that the evacuated condensate CANNOT freeze. INFORMATION For information on the available options, contact your dealer.
6 Charging refrigerant Charging additional refrigerant NOTICE Before charging additional refrigerant, make sure the outdoor unit's ALWAYS use a recommended bubble test solution from external refrigerant piping is checked (leak test, vacuum drying). your wholesaler. NEVER use soap water: INFORMATION ▪...
7 Electrical installation WARNING To fix the fluorinated greenhouse The appliance shall be stored in a room without gases label continuously operating ignition sources (example: open flames, an operating gas appliance or an operating electric 1 Fill in the label as follows: heater).
8 Finishing the outdoor unit installation WARNING Keep the interconnection wiring away from copper pipes without thermal insulation as such pipes will be very hot. Specifications of standard wiring Gas pipe components Gas pipe insulation Interconnection cable Component Field wiring (if applicable) Liquid pipe Power supply cable Voltage 220~240 V...
11 Disposal The outdoor unit is properly mounted. 10.4 Starting up the outdoor unit See the indoor unit installation manual for configuration and The system is properly earthed and the earth terminals commissioning of the system. are tightened. The power supply voltage matches the voltage on the identification label of the unit.
11 Disposal Gas stop valve Closing direction Hexagonal wrench Valve cap Liquid stop valve 11.3 To start and stop forced cooling There are 2 methods to perform forced cooling. ▪ Method 1. Using the indoor unit ON/OFF switch (if present on the indoor unit).
12 Technical data Technical data A subset of the latest technical data is available on the regional Daikin website (publicly accessible). The full set of latest technical data is available on the Daikin Business Portal (authentication required). 12.1 Wiring diagram 12.1.1...
Page 15
12 Technical data Symbol Meaning Diode bridge, Insulated-gate bipolar transistor (IGBT) power module Wireless remote controller Terminal Terminal strip (block) Electronic expansion valve coil Y*R, Y*S Reversing solenoid valve coil Ferrite core ZF, Z*F Noise filter (A)RXP20~35M5V1B Installation manual R32 split series 3P650253-6E –...