The library will be installed by a certified Spectra Logic field engineer. This
chapter outlines the requirements for storing and moving the library and
its components. Make sure that you review these requirements carefully.
The information is provided to ensure that the installation site meets the
necessary requirements before the Spectra Logic field representative arrives.
Topic
Receiving and Storing the Library
Unpacking and Moving the Library
Moving the Library After Installation
Library frames are very heavy (see product specifications for details). Use extreme
WARNING
caution and proper equipment when moving these, and ensure that your floor has
adequate structural integrity.
Boxed and unboxed library components weigh from 200 to 400 pounds each (91 to
WARNING
181 kg) or more. Use extreme caution and proper equipment when moving these.
The ties around the shipping crates are secured very tightly; the tension may cause
WARNING
them to whip outward when cut. Use care when cutting the ties so that you will not
be hit.
Preparing for Installation
32
C
HAPTER
3
page 33
page 34
page 36
Need help?
Do you have a question about the TFinity and is the answer not in the manual?
Questions and answers