Chapter 2 — Site Requirements
Floor and Ceiling Cable Access
Figure 6 through Figure 8 on page
access holes for main, drive expansion, and service frames. See Figure 10 
on page
dimensions are different for the floor and ceiling access holes. Be sure to 
consider the structural integrity of the floor before cutting holes in the floor 
for access.   
Library frames are very heavy (see product specifications for details). Use extreme
WARNING
caution and proper equipment when moving these, and ensure that your floor has
adequate structural integrity.
March 2015
28 to see the location of these access holes in a frame. The 
3.25 in.
(8.6 cm)
5.75 in.
1.3 in.
(14.6 cm)
(3.3 cm)
1.875 in. (4.8 cm)
Figure 6 Ceiling cable access for main and drive expansion
frames.
2.3 in.
(5.8 cm)
1.3 in.
(3.3 cm)
5.5 in. (14.0 cm)
Figure 7 Ceiling cable access for service frames.
Site Preparation Guide—Spectra TFinity Library
23 provide the dimensions for cable 
29 in. (73.7 cm)
5.75 in.
(14.6 cm)
4.0 in.
(10.1 cm)
1.875 in. (4.8 cm)
29 in. (cm)
4.0 in.
4.0 in.
10.0 in.
(10.3 cm)
(10.3 cm)
(25.1 cm)
5.5 in. (14.0 cm)
Physical Requirements
5.75 in.
(14.6 cm)
22

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the TFinity and is the answer not in the manual?

Table of Contents