Cabling Requirements - Spectra TFinity Site Preparation Manual

Hide thumbs Also See for TFinity:
Table of Contents

Advertisement

Chapter 2 — Site Requirements
N
C
ETWORK
ABLING
The library can accommodate cabling from either the bottom or the top of 
the library. See Floor and Ceiling Cable Access on page
information.
Use Figure
connectivity for the library installation.
Figure 10 Locations for network cable connections.
March 2015
R
EQUIREMENTS
10 and the descriptions that follow to plan network 
Cable access cutouts
BlueScale Vision
camera Ethernet port
Robotics Interface
Module (RIM)
RIM
Fibre Channel
connectors (2)
LTO-5 or LTO-6 Drive
Library Control
Module (LCM)
Cable access cutouts
Site Preparation Guide—Spectra TFinity Library
Network Cabling Requirements
Fibre Channel
ports
RIM2
Fibre Channel
connectors (2)
LTO-4 Drive
Ethernet ports
22 for additional 
Fibre Channel
connectors (2)
TS11x0 Technology
Drive
28

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the TFinity and is the answer not in the manual?

Subscribe to Our Youtube Channel

Table of Contents