Oracle X9-2 Service Manual page 38

Hide thumbs Also See for X9-2:
Table of Contents

Advertisement

Oracle Database Appliance X9-2-HA Storage Shelf Hot Pluggable Components
Slide the new I/O module into the disk shelf and close the locking lever.
4.
Caution:
Equipment damage. Be careful not to damage the connector pins at the
back of the I/O module.
Reconnect the cables.
5.
Verify that the new I/O module is working correctly.
6.
After approximately 60 seconds, the power LED should be solid green and the
Fault/Locate LED should be off.
For each port that has a cable connected, all four activity LEDs should be solid
green.
Chapter 3
3-16

Advertisement

Table of Contents
loading

Table of Contents