Figure 137 - Pressure Probe Direction; Figure 138 - Air Flow Switch Connections - Pace PAI Installation And Assembly Manual

Indoor and outdoor air handling units
Table of Contents

Advertisement

PACE │ Installation & Assembly Manual

Figure 137 - Pressure Probe Direction

Figure 138 - Air Flow Switch Connections

Issue Date: 07/03/2018
TOP VIEW OF UNIT
POSITIVE PRESSURE / AIR BLOWN THROUGH HEATER
BLOWER
NEGATIVE PRESSURE / AIR BLOWN THROUGH HEATER
AIR FLOW
SECTION 3 - HANDLING, STORAGE, AND INSTALLATION
HEATER
AIR FLOW
PICK UP TUBE TOWARDS BLOWER ATTACHED
TO HIGH PORT OF AIR FLOW SWITCH
HEATER
PICK UP TUBE TOWARDS BLOWER ATTACHED
TO LOW PORT OF AIR FLOW SWITCH
82
BLOWER
LD12468
LD12470
Form PA102.20-N1

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pao

Table of Contents