Pace PAI Installation And Assembly Manual page 12

Indoor and outdoor air handling units
Table of Contents

Advertisement

PACE │ Installation & Assembly Manual
Air Filters
Installing a 2 in. Pleated Filter
Installing a 4 in. Pleated Filter
Installing a Single Headered (SH) Filter
Installing a 2 in. Pre-Filter Combined with a
SH Final Filter
Installing a Multi-Cell SBM Double Headered
(DH) Filter
Installing a 2 in. and 4 in. Pre-Filter Combined
with a DH Final Filter
Air Measuring Device Connections
Assembling the End Channel Shipping Split
Assembling the PACE Provided Curb
Clearance and Mounting for Indoor AHUs
Coil Piping
Staggered Coils
Hot and Chilled Water Coils
Water Treatment
Condensate Drain Arrangement
Drains and Traps
Condensate Drain Piping
Elevating AHU for Gravity Floor Drain
Connections
Duct Connections
Duct Connection Guidelines
Flanged Duct or Sleeves
Raw or Straight Edge Duct or Sleeves
Sound and Vibration Transmission
General Electrical Information
HEPA Filters
Hot Gas Bypass (HGBP)
Inspection, Damage, and Shortage
Receiver's Responsibility
Shipped Loose Parts
Installing Ceiling Suspended AHUs
Installing Damper Actuator
Installing Multi-Zone (MZ) Dampers
Installing Field Supplied MZ Damper Actuators
Installing External Vent Piping for Outdoor
AHUs
Issue Date: 07/03/2018
SERVICE TASK REFERENCE
47
50
51
52
52
53
54
70
40
24
26
88
88
89
91
75
93
93
94
94
94
94
95
95
77
56
105
20
20
21
27
41
42
43
75
12
Installing Hood with Moisture Eliminator
Installing Indoor AHU
Installing an AHU with Expanded Cabinet
Installing Outdoor AHU
Single Piece
Multi-Piece
Installing Pipe Chase
Tools and Materials
Apply Gaskets
Attach the Pipe Chase
Install Cover Angles
Install Base Rail Covers
Installing Tiered AHU
Long Term Storage
Piping Connections
Power Connections
Single Point Power
Wiring the Gas Heat Device
Wiring the Electric Heat Device
Electric Humidifier
Humidifier
Lights for AHUs
Preparing the Site
Proper Lifting with Shackles
Refrigeration
DX Direct Expansion Coils
Available Coil Arrangements
Rigging
Indoor and Outdoor AHUs
Shipped Loose Parts
Short Term Storage
Thermostatic Expansion Valves (TXV)
Tools Required to Install AHU
UVC Emitter Lamps
Two Types of Lamps
VAV System
VIFB and IFB
Shipping Bolts
Visual Control Filter Clamps
33
34
35
28
28
29
71
71
72
72
73
74
38
20
87
77
77
79
80
84
84
87
23
22
101
101
103
21
21
43
19
105
28
65
65
107
97
97
57
Form PA102.20-N1

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pao

Table of Contents