Installation; Wall Drilling And Bracket Fixing - Midea WHK 7.62 BL User Manual

Table of Contents

Advertisement

Available languages

Available languages

INSTALLATION

Wall drilling and bracket fixing

A
(2)
B
C
(OPTIONAL)
250
C
(3)
As a first step, proceed with the following drawings:
A vertical line up to the ceiling or up to the upper limit, at the center of the area in which
the hood is to be fitted.
A horizontal line A at 1320 – 1700 mm above the cooker top.
A horizontal line B at a minimum 926 mm above the cooker top.
A horizontal line C at a minimum 730 (910 optional) mm above the cooker top.
Mark Points:
Mark a point (1) on the horizontal line A, 60 mm to the right of the vertical reference line.
Repeat this operation on the other side, checking that the two marks are leveled.
Mark a point (2) on the horizontal line B, 80 mm to the right of the vertical reference line.
Repeat this operation on the other side and on the vertical reference line, checking that
the three marks are leveled.
60
(1)
60
80
80
250
130
130
21
12
10
10
10
5
11
20
11
Optional
11

Advertisement

Table of Contents
loading

Table of Contents