QUEST ELITE 4 Flavor Installation, Service & Decommissioning Manual
!
CAUTION:
Refrigeration Servicing
Safety should be considered before equipment Service in Field:
During the evacuation test, after achieving a vacuum level of 50 Microns or less, the refrigeration system shall be isolated from
the vacuum pump and the pressure shall not rise above 1500 microns within 10 min.
The vacuum pressure level shall be lessor of 50 microns or value required for compliance with national and local codes and standards,
which may vary between residential, commercial, and industrial buildings.
Publication Number:721Q14101MNL
- 4 -
© 2022, Marmon Foodservice Technologies Inc.