Download Print this page

Dell EMC Edge Gateway 5200 Service Manual page 8

Hide thumbs Also See for EMC Edge Gateway 5200:

Advertisement

Table 1. Expansion module packing list - 4G (continued)
Item
4G label
4G heat sink
Thermal pad
Table 2. Expansion module packing list - 5G
Item
Screw M3 x 6L
Screw M3 x 4L
Standoff H7.8
Standoff H19.5
Bracket
5G M.2
SMA cable
Antenna
5G label
5G heat sink
Thermal pad
Steps
1. Remove the eight screws from the bottom panel of the EGW-5200, as shown in the following figure, and remove the bottom
panel.
Figure 6. Bottom panel screw locations
2. Remove the screws and nuts from the inside of the bottom panel and side panel, as shown in the following figures.
8
Installation procedure for 4G and 5G expansion modules
Quantity
1
1
1
Quantity
1
7
1
2
1
1
4
4
1
1
1
Notes
-
-
-
Notes
Torque required: 4.0 kgf.cm
Torque required: 4.0 kgf.cm
Torque required: 4.5 kgf.cm
Torque required: 4.5 kgf.cm
-
-
-
-
-
-
-

Advertisement

loading