Download Print this page

Dell EMC Edge Gateway 5200 Service Manual page 47

Hide thumbs Also See for EMC Edge Gateway 5200:

Advertisement

Installation procedure for 2x Canbus uFM
About this task
Installation requires the removal of WiFi, as well as COM3 and COM4 ports. The 4-port COM cable will be replaced with an
included dual-port COM cable.
Table 10. Expansion module packing list
Item
Screw M3 x 4L
Standoff H4
Screw M2.5 x 6L
Nut M3
Cable tie
Rubber cap
Sheet metal I/O panel
Canbus mPCIe
Dual-port COM cable
Cable
Steps
1. Remove the eight screws from the bottom panel of the EGW-5200, as shown in the following figure, and remove the bottom
panel.
Figure 81. Bottom panel screw locations
Quantity
Notes
8
Torque required: 4.0 kgf.cm
8
Torque required: 4.5 kgf.cm
2
Torque required: 3.0 kgf.cm
4
Torque required: 4.0 kgf.cm
2
-
2
-
1
-
1
-
1
-
2
-
Installation procedure for 2x Canbus uFM module
VI
module
47

Advertisement

loading