Carrier PrimeLINE Operation And Service Manual page 157

Container refrigeration units
Table of Contents

Advertisement

7.28 Controller Programming Procedures
This section contains programming procedures for data downloads, software loading, and configuration changes.
These are performed by using the unit display and the controller's programming port (See
Videos are available that explain different programming procedures and methods for using the programming port.
The videos can be viewed from:
Carrier Transicold's Container Refrigeration
Carrier Transicold's ContainerLINK™ app that is available for Apple or Android devices. In ContainerLINK,
from the main menu navigate to Resources > Videos.
The following hardware solutions can be utilized with the programming port:
MUA Adapter with USB drive (Part # 07-00571-00).
MST Service Tool with USB drive (Part # 07-00-00572-00).
USB Adapter and USB drive**.
PCMCIA sRAM Card**
** Device still supported but no longer available for purchase.
The unit must be OFF whenever a programming device is inserted or removed from the
controller programming port.
7.28.1
Downloading Unit Data
1. Turn unit power off ("0") at the Start-Stop switch (ST).
2. Inspect the pins on the controller's programming slot for damage.
3. Insert the programming device (with proper software loaded) into the slot. See
4. Turn unit power on ("I") at the Start-Stop switch (ST).
5. The display will show "Usb LOAd". Use the Arrow keys to select "dnLd dAtA" and press the ENTER key.
For PCMCIA sRAM cards, the display will open directly to the "dnLd dAtA" menu.
6. Use the Arrow keys to scroll through the download options (triP, 30 day, 60 day, 90 day, All). The amount of
available space on the USB is also displayed in this menu. Press ENTER to confirm the download choice.
7. The display will flash "dnLd" while downloading and then "dnLd donE" when complete.
8. Press the CODE SELECT key to see free space remaining.
9. Turn unit power off ("0") at the Start-Stop switch (ST).
10. Remove the programming device from the controller. The download files can now be transferred to PC for
data evaluation with DataLINE.
11. Turn unit power on ("I") at the Start-Stop switch (ST).
7.28.2
Loading Operational Software
PrimeLINE units must be loaded with software version 53XX. See the label in the control box door for factory
installed software version.
1. Turn unit power off ("0") at the Start-Stop switch (ST).
2. Inspect the pins on the controller's programming slot for damage.
3. Insert the programming device (with proper software loaded) into the slot. See
4. Turn unit power on ("I") at the Start-Stop switch (ST).
5. The display will show "Usb LOAd". Use the arrow keys to select "LOAd SoFt" and press the ENTER key.
The display will show "SEt UP"
YouTube
channel.
Click for instructions
Click for instructions
CAUTION
!
NOTE
.
7–37
Figure
Click for instructions
Figure 7.19
Figure
7.19).
7.19.
T-362

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Primeline one69nt40-561-20069nt40-561-50069nt40-565-20069nt40-565-500

Table of Contents