SKE-Series Voice Evacuation System Installation/Operation Manual
4. Wire AC to the transformer as shown in Figure 3-14.
5. Plug the transformer output to the AC connector on the control panel as shown in Figure
3-13.
3-16
Figure 3-14 AC Connections
firealarmresources.com
151267