Assembly - Grizzly G0695 Owner's Manual

Vs milling machine with ram head
Hide thumbs Also See for G0695:
Table of Contents

Advertisement

bolting to Concrete floors
anchor studs and lag shield anchors with lag
bolts (see figure 7) are two popular methods for
anchoring an object to a concrete floor. We sug-
gest you research the many options and methods
for mounting your machine and choose the best
that fits your specific application.
anchor stud
Lag shield anchor & Bolt
figure 7. typical fasteners for mounting to
concrete floors.
using Machine Mounts
Using machine mounts, shown in figure 8, gives
the advantage of fast leveling and vibration reduc-
tion. the large size of the foot pads distributes
the weight of the machine to reduce strain on the
floor.
figure 8. machine mount example.
-16-

Assembly

To assemble your mill:
1.
secure the three handles to the handwheels
with the m6-1 x 25 cap screws, as shown in
figure 9.
figure 9. handle attached to handwheel.
2.
Use the external retaining ring pliers to
remove the retaining ring from the end of the
vertical crank screw, reverse the crank han-
dle from its shipping position, then re-install
the retaining ring (see figure 10).
figure 10. Vertical crank handle properly
installed.
model g0695 (mfg. since 9/10)
handle
retaining ring

Advertisement

Table of Contents
loading

Table of Contents