Ventilation; Bleeding The Hood Lifting Cylinder (Option) - Wexiodisk WD-6 Installation And User Manual

Glass dishwasher
Table of Contents

Advertisement

Installation instructions

3.5.4 Ventilation

The machine's heat load for the room is stipulated in TECHNICAL
SPECIFICATIONS.

3.5.5 Bleeding the hood lifting cylinder (option)

1.
2.
3.
4.
5.
Glasstilt
Close the hood.
Loosen the hose connection of the first air cylinder approx. 2-3 turns using
a 13 mm box wrench.
Keep the hood in the closed position. Press the up button. Check that only
water and no air comes out of the hose connection. Otherwise repeat the
procedure.
Tighten the hose connection with the hood still in the lower position.
Repeat the same procedure with the second cylinder.
15
Rev. 2.0 (202202)

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Wd-7Wd-6 duplusWd-7 duplus

Table of Contents