Operation Options; Overview Of Operation Options; Commissioning; Function Check - Endress+Hauser Liquiphant FTL41 Brief Operating Instructions

Vibronic point level switch in liquids
Hide thumbs Also See for Liquiphant FTL41:
Table of Contents

Advertisement

Operation options

6
Operation options
6.1

Overview of operation options

6.1.1
Operation concept
Operation with DIP switches on the electronic insert
6.1.2
Elements on the electronic insert
 23
Example of electronic insert FEL44
1
LED red, for warning or alarm
2
LED yellow, switch status
3
LED green, operational status (LED green lights up = device on)
4
DIP switch to set the density to 0.7 or 0.5
5
Relay contact terminals
6
Power supply terminals
7
DIP switch for setting MAX/MIN safety
7

Commissioning

7.1

Function check

Before commissioning the measuring point, check whether the post-installation and post-
connection checks have been performed:
 Checklist for the "Post-installation check" section
A
 Checklist for the "Post-connection check" section
A
7.2

Powering up the measuring device

During the power-up time, the device output is in the safety-oriented state, or in the alarm
state if available.
The output will be in the correct state max. three seconds after powering up the device.
26
1 2 3
MAX
7
U = 19...55 V DC
MIN
~ ~
U 19...253 V AC
L1
N
6
1
2
3
>0,7
3 5
6
8
>0,5
4
7
4
5
6
7
8
Liquiphant FTL41
4
5
Endress+Hauser
A0039317

Advertisement

Table of Contents
loading

Table of Contents