Power Connection; Indicators Status - Yeastar Technology NeoGate TG Series Installation Manual

Hide thumbs Also See for NeoGate TG Series:
Table of Contents

Advertisement

http://arttel.ru
1.
Connect the antenna.
Connect the antenna to the relevant place.
2.
Insert SIM cards.
Push the SIM card into the card slot on the front panel.

3.2.3 Power Connection

Once users have made sure that device installation, cable connection and power type are correct,
please switch on the power. Then NeoGate will start booting. In the meantime, users would see
that the "POWER" and "RUN" indicator lights turn on.
Please switch off the power before plugging or unplugging the cables.

3.2.4 Indicators Status

When power is connected, users should be able to find that the "Power" indicator, "RUN"
indicator, and GSM port status indicator beside the slot that has installed SIM cards turn on.
https://arttel.ru/shop/3g-shlyuzy/yeastar-neogate-tg800w
NeoGate TG Series Installation Guide
12/16

Advertisement

Table of Contents
loading

Table of Contents