System Set Up; Installation Of Bri Module; Ethernet Line Connection; Power Supply Connection - Yeastar Technology NeoGate TB400 User Manual

Hide thumbs Also See for NeoGate TB400:
Table of Contents

Advertisement

2. System set up

2.1 Installation of BRI Module.

Open the case of NeoGate, adjust the pins to the slots and insert then insert
the spins into the slots.
Note1: Please turn off the device when installing the modules.

2.2 Ethernet Line Connection

NeoGate provides two 10/100M Ethernet ports with RJ45 interface and LED
indicator.
Plug Ethernet line into NeoGate's Ethernet port, and then
connect the other end of the Ethernet line with a hub, switch, router, LAN or
WAN. Once connected, check the status of the LED indicator. The green LED
indicates the port is properly connected.

2.3 Power Supply Connection

NeoGate utilizes the high-performance switch power, which supply the
enough voltage and electrical energy that required by NeoGate system.
AC Input: 100~240V
DC Output: 12V,1A
Please follow the steps below to connect the NeoGate unit to a power outlet:
1. Connect the small end of the power cable to the power input port on the
NeoGate back panel, and plug the other end of the cable into a 100VAC
power outlet.
2. Check the Power LED on the front panel. A solid green LED indicates that
power is being supplied correctly.
www.yeastar.com
NeoGate TB400 User Manual
5

Advertisement

Table of Contents
loading

Table of Contents