Installation
3.4
General instal-
Observe the following instructions when attaching connecting wires to the termi-
lation instructions
nal strip:
Shorten all the wires used to the length required for the installation.
Basically, fit all stranded wire ends with wire end sleeves before connecting
Any wires that are not used and project into the housing must be cut off as
Materials required
Wire end sleeves, suitable for the connecting wires, with suitable crimping
1 x cable gland with sealing ring (scope of delivery MIQ/CHV PLUS)
Tools
Cable stripping knife
Wire stripper
Phillips screw driver
Small screw driver
12
All manuals and user guides at all-guides.com
Connecting the valve control line
The valve control line must be connected if the valve is not
controlled via the IQ S
them to the terminal strip.
closely as possible to the cable gland.
tool
WARNING
Danger of injury from lines that are under pressure. Before
opening the compressed air line, ensure that the section
of line concerned is free of pressure. The compressed air
glands in the housing may only be opened by a service
technician authorized by WTW.
N
system.
ENSOR
ET
ba75539d03
MIQ/CHV PLUS
03/2018