Lindsay GROWSMART Installation Manual page 17

Variable rate irrigation
Table of Contents

Advertisement

Installing Nodes, Looms and GPS Units
The nodes and cable looms have been cut to length, making it imperative that they are installed in the correct
order. Refer to the sprinkler chart for the node location and cable length. All node boxes should be mounted to the
same side of the irrigation span pipes so there is less interference with the wireless communications.
1605647 VRI
Standard Node
Assembly
Worm Gear style
Hose Clamps
Slots in hanger bracket
are for adjusting to the
various pipe diameters.
The correct node order is:
Pivot Point ► Node 1 ► Node 2 ► Node 3 ► etc.
The valve order is:
Pivot Point ► 1A ► 1B ► 1C► 1D► 2A► 2B► 2C► 2D► etc.
Note: The node enclosures are mounted on the same outlet as Valve B for each set of valves.
The nodes are set up to be connected via power cable in a "daisy chain" fashion. The power line from node 1 con-
nected to node 2; another power line connects node 2 to node 3 and so on, until reaching the 24V power supply at
the center of the system.
P/N 1600043 Rev M (ECN 34095)
GPS Mounts via magnetic base to the
hanger. For added support, the GPS can
be bolted to the hanger, with the screw
and lock washer provided, at this mount
hole location.
#10-24 Screws
Fasten to threaded holes in back of panel.
(Tabs are not longer present.)
1605863 VRI Hanger Bracket
3
GPS Unit (Last Node Only)
Found in Kit 1498710
VRI Installation Manual

Hide quick links:

Advertisement

Table of Contents
loading

Related Products for Lindsay GROWSMART

Table of Contents