Chapter 4: Testing the complete configuration

This section provides tests for the complete configuration, including the control network,
signaling network, telephones, and consoles.
This section provides tests to:
Review the status of the configuration
Test the duplication link to the media servers (S8700-series only)
Test the IP server interfaces, expansion interfaces, and time-division multiplexing (TDM)
buses in the port networks (PNs)
Test the telephones and other equipment
For information about the LED status indicators for the Avaya Ethernet switches, uninterruptible
power supplies (UPSs), and circuit packs, see
Note:
Cabinet and slot usually indicate circuit pack positions. Port can also indicate
Note:
position. The term "cabinet" refers to five G650 Media Gateways that are
TDM-cabled together in a rack to make up one PN. A port network is defined as a
group of media gateways that are connected together with one TDM bus.
Perform the following tasks to test the configuration:
!
CAUTION:
To prevent unnecessary trouble tickets, do not enable the alarms, Alarm
CAUTION:
Origination feature, until you complete all installation and administration
procedures.
Testing port network equipment
Checking PN status for each media gateway
Checking circuit pack configuration
Testing the TN2312BP IPSl circuit pack
Testing bearer duplication with the TN2602AP circuit pack
Testing the TDM bus for each PN
Testing telephones and other equipment
LED indicators
on page 58
on page 58
on page 58
on page 59
on page 60
on page 61
on page 66.