Preinstallation Requirements - Avaya G650 Installing

Hide thumbs Also See for G650:
Table of Contents

Advertisement

Introduction
Administrator Guide for Avaya Communication Manager, (03-300509). Provides user
information on how to administer trunks and telephones.
Administration for Network Connectivity for Avaya Communication Manager,
(555-233-504). Provides information on network connectivity.
Maintenance Commands for Avaya Communication Manager 4.0, Media Gateways and
Servers, (03-300431). Provides information on how to use command interfaces, command
syntax, and output from maintenance-related commands.
Maintenance Alarms for Avaya Communication Manager 4.0, Media Gateways and
Servers, (03-300430). Provides information on how to use alarms, error codes, and tests
to diagnose and repair problems.
Maintenance Procedures for Avaya Communication Manager 4.0, Media Gateways and
Servers (03-300432). Provides information on how to troubleshoot and replace various
components.
Installing and Operating a 120A Channel Service Unit with Avaya Communication
Manager (03-601508). Provides procedures on how to install and use a 120A Channel
Service Unit, which may be used in some G650 configurations.
The following job aids are also available on the CD-ROM Documentation for Avaya
Communication Manager, Media Gateways and Servers:
- Approved Grounds. Provides a description of all approved grounds.
- Connector and Cable Diagrams (Pinout Charts). Provides pinout information for various
components.
- Option Switch Settings. Provides settings for various components.
For all documents associated with the S8400, S8500, S8700-series Media Server, see the CD
titled Documentation for Avaya Communication Manager, Media Gateways and Servers
(03-300151).

Preinstallation requirements

The preinstallation team performs the following tasks. If these are not complete when you are
ready to start the installation, do not start the installation.
Verify that:
The open, customer-supplied, EIA-310D or equivalent standard 19-inch (48-centimeter)
equipment racks are properly installed and solidly secured. Ensure that you also have the
screws that come with the racks.
The rail kits, which are required to support the heavy UPSs, are installed on the rack or
available for installation. For how to install the rails, see the documentation that comes with
the rail kits.
10 Installing the Avaya G650 Media Gateway

Advertisement

Table of Contents
loading

Table of Contents