LOTO Procedure for System Power
Step
1
2
3
4
5
6
7
8
9
10
11
12
Page 24
6
EVISION
Lockout/Tagout Procedure
Prepare for shutdown of equipment by notifying affected personnel working in the area
that lockout/tagout is being performed.
Bring system software down.
3.
Locate main power supply (Service) disconnect feeding System Cabinet.
Lock Out / Tag Out the main power disconnect.
Using an insulated voltmeter, measure the incoming power connection to the system
cabinet at the circuit breaker.
If no voltage is present at the system cabinet's circuit breaker; place the power switch on
the Cabinet to the OFF position and service equipment as required.
After service has been performed, notify affected personnel that equipment will be re-
energized and LOTO devices are being removed.
Assure the safety of the area and that all safety devices and guards have been replaced
Return system functions to a preset state.
Remove Lock-Out Tag-Out equipment from main disconnect.
Locate main power supply (Service) disconnect feeding System Cabinet and re-apply
power.
Perform system startup.
Name of Equipment: System
See De-Energizing System on page 26.
See Energizing System on page 25.
-
B
XR118 S
M
RIVO
ERVICE
ANUAL
And return to step