Chapter 2. Installing And Configuring The Switch; Items Included With The Switch - IBM SAN24B-5 Installation, Service And User Manual

System networking
Hide thumbs Also See for SAN24B-5:
Table of Contents

Advertisement

Chapter 2. Installing and configuring the switch

You can install the SAN24B-5 switch in the following ways:
v As a stand-alone unit on a flat surface. For instructions and more information,
v In an Electronic Industries Association (EIA) cabinet using the fixed rack mount
This chapter provides the following information:
v "Items included with the switch"
v "Site preparation and installation requirements" on page 6
v "Setting up the switch as a standalone unit" on page 7
v "Installing in an EIA cabinet" on page 9
v "Configuring the switch" on page 14

Items included with the switch

The following items are included with the standard shipment of the switch. When
you open the packaging, verify that these items are included in the package and
that no damage occurred during shipping.
Note: If any items are damaged or missing, within the United States and Canada,
v The SAN24B-5 switch, containing one integrated power and fan assembly
v 16 Gbps or 8 Gbps SFP+ modules for the Fibre Channel ports (speed and
v One accessory kit, containing the following items:
© Copyright IBM Corp. 2012
see "Setting up the switch as a standalone unit" on page 7.
kit, slide rack mount kit, or the mid-mount rack kit. For more information, see
"Installing in an EIA cabinet" on page 9.
Attention: Read the "Safety notices and labels" on page xiii before
attempting any installation, maintenance, or service procedures.
contact the IBM Quality Hotline toll-free 1-800-442-6773 or direct dial in
other locations: 770-858-8459.
(optional second power and fan assembly)
quantity as ordered)
– SAN24B-5 Installation, Service, and User Guide (this document).
– IBM documentation CD
– Safety notices
– Slim rail rack mount kit
– Serial cable with an RJ45 connector
– One 6 ft. (1.8 m) country-specific power cord (two if second power supply is
ordered)
– Rubber feet, required for setting up the switch as a standalone unit
– SAN24B-5 Quick Start Guide
– EZSwitch Setup CD
– Warranty
– Environmental notices
5

Advertisement

Table of Contents
loading

Table of Contents