Hardware - Agilent Technologies 700 Series User Manual

Icp optical emission spectrometers
Hide thumbs Also See for 700 Series:
Table of Contents

Advertisement

Installation
7
It will take up to 2 to 3 minutes to perform a Wavelength Calibration. Once
NOTE
completed, a message will be displayed confirming the wavelength calibration is
complete, and the range of wavelengths over which the instrument has been
calibrated.
8
The signal (Intensity or SRBR) as a function of the torch viewing position will be
NOTE
displayed. The highest point in the scan is identified by the software, and the
corresponding viewing position value is stored and used for all subsequent
measurements.
9

Hardware

Your ICP-OES should be ready to operate after the Agilent field
service engineer has installed it. However, you may need to set up
items such as the peristaltic pump, nebulizer, torch or spraychamber.
For instructions on how to do this, please refer to the Help. Click
Start > Programs > ICP Expert II > ICP Expert II Help.
When the ICP Expert II Help appears, click How to > Install
instrument components to view step-by-step instructions on how to
remove and install the various instrument components.
32
Aspirate the wavelength calibration solution. Select the W/L
Calib tab.
If you have a 710/715 Series ICP-OES, click Calibrate
Wavelength to perform a wavelength calibration.
If you have a 720 Series ICP-OES, click Calibrate to perform a
wavelength calibration.
Click the Torch Align tab. Check that the Graph Type is set to
Intensity. Set the Orientation to Horizontal and click the Torch
Scan button.
If you have an ICP-OES with an axially oriented plasma, change
the setting or 'Orientation' to Vertical and click Torch Scan
again. If you have an ICP-OES with a radially oriented plasma,
this step is not required.
Agilent 700 Series ICP Optical Emission Spectrometers User's Guide

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

710 series715 series720 series725 series

Table of Contents