Siemens Sicharge CC AC22-ERK Operating Instructions Manual page 35

Hide thumbs Also See for Sicharge CC AC22-ERK:
Table of Contents

Advertisement

Assembly/installation
4.2 Preparation before assembly
Required tools
The required tools are not included in the scope of delivery.
• Combination wrench set up to 19 width across flats
• Key for housing (in the accessory kit)
• Spirit level
• Phillips head screwdriver set
• Slotted screwdriver set
• Tool set for electricians
• Allen key size 4, 5, 6
Required material
The required material is not included in the delivery.
• Concrete foundation
• Reinforcement
• Mounting plate, anchor system or threaded rods
• Empty pipe or corrugated pipe
• Cable tie set
• Strain relief that matches the cable (i.e. OBO clamping bracket / BBS clamp)
• Optional:
Sealing compound or sealing sleeve for the empty pipes or corrugated pipes used
• Sealing between foundation and charging station (e.g. base filler Hager-ZAY95075)
Required quantity: Approx. 2.5 liters.
34
SICHARGE Operating instructions, ERK
Operating Instructions, 06/2021, A5E48571690-AC

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sicharge cc ac22

Table of Contents