6. Start up
Before to supply the thyristor unit:
• verify that load current equal or less than nominal;
For resistive load
P
I
=
tot
V
3
• verify that there is no short circuit on load;
• verify that main voltage equal or less than nominal;
• verify that all auxiliary connections are right;
• fan voltage equal than nominal (230V std , 110V optional)
After which supply thyristor unit giving the maximum i n put signal and verify that load current is
equal or less than thyristor unit nominal current.
Warning: this procedure can be done just by specialized personnel.
The
thyristor
requirements. If it's necessary to change on site the configuration, procede as below
specified.
www.cdautomation.com
CD3000S-2PH from 125A to 700A
unit
is
delivered
18
configured
and
tuned
C.D. Automation Srl
in
line
with
customer

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the CD3000S-2PH and is the answer not in the manual?

Table of Contents