Failure to turn off Tab (Equipment operation management Screen)

(1)
(2)
(3)
The sampling period is displayed in (1). The sampling period is a period of 31 days or less,
starting from the 1st day of the same month of the last year to today of this month.
Set the Data target in (2). Touching the Modify button displays the list of registered areas on the
Data Target Setup screen. Select the targets from the screen and touch the OK button.
In the Oper. Rule combo box (3), select an operation rule from those registered and touch the
Sampling button (4).
The graph corresponding to the sampling result is displayed in (5).
<Interpreting the Graph>
• The horizontal axis represents the number of days on which failure to turn off occurred.
When displayed by area, the total days on which the management points included in the
area were not turned off is displayed.
• The vertical axis represents the total time.
• Management points and areas where failure to turn off occurred are displayed with a blue
• Management points and areas selected in the list are displayed with an orange
• If the number of management points and areas where failure to turn off occurred exceeds
50, the top 50 are displayed.
(6)
is the list of sampling results. The list displays the name of the management points and areas,
the number of days on which failure to turn off occurred, the accrual time, and the amount of
energy consumed.
If the number of management points and areas where failure to turn off occurred exceeds 50, the
50 with the most occurrence days and duration are displayed.
(4)
(5)
User's Manual EM11A015B
intelligent Touch Manager
(7)
(8)
(6)
.
.