Summary of Contents for Eco-Systems Backlit Hybrid S ECO-1087
Page 1
Order #XXXXX - ECO-1087 - 10’x10’ Backlit Sustainable Exhibit 10’ 10’ Plan View 866.463.2611 • www.ecosystemsdisplays.com...
Page 2
General Setup Instructions •The setup instructions are created specifically for your configuration. •Setup instructions are laid out sequentially in levels, including exploded views and a logical series of steps for assembly. We encourage you to study the instructions before attempting to assemble your exhibit. Cleaning and Packing •Use non-abrasive cleaners when cleaning extrusions or ECO Glass inserts.
Page 3
ECO Panel Install Place ECO panel together with a vertical offset, slide down to lock connector in place. Panel Corner Connectors are installed just like ECO panels. Remove by off-setting top lock clips horizontally followed by separating vertically. SEG Graphic Install Graphic is installed corners first.
Page 4
Top View of Each Level Graphics Setup Hardware Level 1 Level 2 866.463.2611 • www.ecosystemsdisplays.com...
Page 5
Top View of Each Level Shelf Base Plates (qty 2) Wings Graphic (qty 4) Headers Level 1 Level 2 Level 3 866.463.2611 • www.ecosystemsdisplays.com...
Page 6
Item Qty. Description Slide V4 Connectors into groove of vertical Baseplate extrusion. Tighten screw 2A/2B 48” CEI110 Horizontal Extrusion Set Screws to secure 3A/3B 48” CEI110 Horizontal Extrusion bolt in place. Use bolts to 4A/4B 40.25” CEI110 Vertical Extrusion attach vertical to 5A/5B 40.25”...
Page 7
Steps: Item Qty. Description 1) Connect Graphic Headers to assembled backwall 8.5”h S12 Vertical Extrusion with A10 Clamps. See A10 Clamp detail. 8.5”h V31 Connector 2) Connect Shelf to Vertical [6A/6B]. Shelf Attachment detail. 3) Install Monitor Mount to vertical [6A/6B] using S12 extrusion &...
Need help?
Do you have a question about the Backlit Hybrid S ECO-1087 and is the answer not in the manual?
Questions and answers