Advertisement

Quick Links

Order ###### - ECO-1109 - 10'x10' Sustainable Exhibit
10'
10'
Plan View
866.463.2611 • www.ecosystemsdisplays.com

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the ECO-1109 and is the answer not in the manual?

Questions and answers

Summary of Contents for Eco-Systems ECO-1109

  • Page 1 Order ###### - ECO-1109 - 10’x10’ Sustainable Exhibit 10’ 10’ Plan View 866.463.2611 • www.ecosystemsdisplays.com...
  • Page 2 General Setup Instructions •The setup instructions are created specifically for your configuration. •Setup instructions are laid out sequentially in levels, including exploded views and a logical series of steps for assembly. We encourage you to study the instructions before attempting to assemble your exhibit. Cleaning and Packing •Use non-abrasive cleaners when cleaning extrusions or ECO Glass inserts.
  • Page 3 ECO Panel Install Place ECO panel together with a vertical offset, slide down to lock connector in place. Panel Corner Connectors are installed just like ECO panels. Remove by off-setting top lock clips horizontally followed by separating vertically. SEG Graphic Install Graphic is installed corners first.
  • Page 4 Item Qty. Description Item Qty. Description Item Qty. Description 47.5”h Square Cap Connector 47.5”h Square Cap Connector 95”h Q914 Vertical Extrusion 19”w x 47.5”h Eco Panel 19”w x 47.5”h Eco Panel 95”h Q914 Vertical Extrusion w/ TSP3 47.5”h 90° Connector 47.5”h 90°...
  • Page 5 Item Qty. Description Base Plate 95”h Q914 Vertical Extrusion w/ TSP3 5/5A 78”w Z45 Horizontal Extrusion w/ TSP3 78”w Q914 Horizontal Extrusion Steps: 1) Install Base Plate [1] to bottom of vertical extrusion [4] using bolt. 2) Connect horizontals [5,5A,5B] between verticals [3,4].
  • Page 6 Using Your Setup Instructions The Aero Overhead Sign Setup Instructions are created specifically for your configuration. They include an exploded view of the frame which is sequentially numbered. We encourage you to study the instructions before attempting to assemble your exhibit. Connections are kept very simple: no tools.
  • Page 7 Light Attachment L ock Clip into Groove of Steps: Horizontal Extrusion, then 1) Install Aero Header Frame to backwall as shown. See Keyhole Attachment detail. slide Light onto Clip. 2) Connect light(s) to horizontal [5A]. See Light Attachment detail. Lock into 3) Attach Standoff Graphics to front cabinet panels using standoff barrels &...

Table of Contents